Engineering Excellence
Built on Trust
System-driven plumbing, waterproofing & fire-fighting execution — from premium villas to hospitals, malls and industries. Every project: Draw · Test · Document.
IPA Lifetime Achievement Award
Indian Plumbing Association
A Legacy of
Proven Engineering
ADVI Plumbing Pvt. Ltd. is Indore's most trusted system-driven plumbing, waterproofing and fire-fighting execution company — a family business founded in 1968 by Late Sri Sohan Lal Ji Prajapat, formally incorporated as a Pvt. Ltd. on 23 May 2023.
From premium bungalows and villas to hospitals, hotels, malls, schools and industries — every project runs on the proprietary Draw · Test · Document (D·T·D) System. Hum claim nahi karte — dikhate hai.
Five Decades of
Engineering Commitment
Family Business Founded
Late Sri Sohan Lal Ji Prajapat lays the foundation in Indore. One standard, one trust — Ek Standard, Ek Bharosa.
Commercial & Industrial Scale-Up
Expanding from residential to hospitals, hotels, malls, schools and industrial projects. Sayaji Hotels, IPCA Laboratories, Gokaldas Exports — delivering at scale.
Highest Industry Recognition
The Indian Plumbing Association awards ADVI the Lifetime Achievement Award — the highest professional recognition in the Indian plumbing industry.
Incorporated as Pvt. Ltd.
Formally structured on 23 May 2023 with stronger governance. 85+ team, 1200+ projects handed over, pan-central-India presence, AMC running with Tata Motors, C21 & Vishesh Jupiter.
Vision & Mission
Our Vision
"Bharat me plumbing sirf kaam nahi, ek respected profession banana hai."
To make plumbing a respected profession in India — not just a trade. Building systems, institutions, and a workforce the next generation can be proud of.
Our Mission
"Mistri se malik tak ka safar aasan banana — accha paisa, sacchi ijjat aur quality kaam ke saath."
To ease the journey from craftsman to business owner — through fair pay, genuine respect and consistently excellent work.
The Differentiators That
Matter to Our Clients
Architects, PMC consultants and developers choose ADVI because we eliminate the three biggest risks: rework, blame-game and post-handover complaints.
58-Year Track Record
Three generations of family commitment. IPA Lifetime Achievement Award. Every project since 1968 — same standard, no exceptions.
Proprietary D·T·D System
Draw · Test · Document — no pipe without a drawing, pressure-tested before tile, as-built handover file. Competitors claim quality; we prove it.
Single Accountability
Material and labour under one partner. 85+ PF/ESIC-insured team. No subcontractor blame-game — one point of contact, always.
Pre-Tile Test Certificate
Concealed leaks are caught before tile goes down — every time. Certificate issued. Zero post-handover plumbing surprises for clients.
As-Built Documentation
Complete drawings and handover file at project close. Ten years later, no guesswork — no breaking walls to find a pipe run.
AMC & Long-Term Support
Active AMC with Tata Motors, C21 Group & Vishesh Jupiter Hospital. Kaam karke gayab nahi hote — we stay for the long term.
The Principles That Guide
Every Project
From the first drawing to the final handover — every decision we make is grounded in these seven non-negotiable principles.
Reliability Over Price
Bharosa pehle, rate baad me. Trust is the foundation — cost follows.
Systems Over Individuals
SOP + checklist. Consistent quality that doesn't depend on one person.
Proof Over Claims
"Hum claim nahi karte — dikhate hai." Test certificates and results speak.
Transparency
No-Surprise BOQ. GST-compliant billing. Full clarity at every stage.
Single Accountability
Material + labour — one partner. No finger-pointing. Clean ownership always.
Long-Term Relationships
Kaam karke gayab nahi hote. We stay — AMC ongoing with major clients.
The 1968 Standard
58 years of one consistent quality benchmark — the same non-negotiable standard that built this company from a single craftsman to 85+ strong. Every project. Every decade.
Quality You Can
Verify & Trust
Every ADVI project follows a non-negotiable quality protocol — from the first drawing to the final handover file. Nothing is concealed without being tested first.
"Plumbing failures happen in planning, not on site. We catch the fault before it reaches your project."
— Core D·T·D Philosophy
1200+
Projects
100%
Tested
58+
Years
Let's Build Better
Projects Together
Partner with ADVI — 58 years of engineering trust, the D·T·D execution system, and single-point accountability. Reputation-safe plumbing, delivered on time.